X-Bridge

X-Bridge: 2010 – 2012. The work was developed with the 3DOM Unit, in collaboration with the REET Unit, Bruno Kessler Foundation, Trento, Italia. The project deals with the surveying of metal bridges with range- and X-sensors, for the monitoring of movements, deformations and internal stresses of the metal structures.

lavis_nuvola1